New Orleans Comprehensive Zoning Ordinance
Printed: 11/8/2024 6:14:31 PM
4.11.F Validity of Permit
All signs shall be erected within six (6) months from the date of issuance of the permit. Otherwise the permit becomes null and void and a new sign permit is required.