New Orleans Comprehensive Zoning Ordinance
Printed: 4/26/2024 4:33:00 PM
4.11.F Validity of Permit
All signs shall be erected within six (6) months from the date of issuance of the permit. Otherwise the permit becomes null and void and a new sign permit is required.