New Orleans Comprehensive Zoning Ordinance

Printed: 3/28/2024 6:27:45 AM

20.3.JJJ.6.d Alternate Designs for Base Flood Elevation Considerations

Where a wireless telecommunications tower base and/or facility shall be elevated above four (4) feet because of base flood elevation (BFE), an alternate fencing and landscape design shall be proposed to take into account the additional height from the BFE. This alternate design shall be approved by the Executive Director of the City Planning Commission.